The client sends a new revision without saying what changed
The updated specifications arrive, or the architectural drawing with a different dimension, and someone at the firm flips through them side by side with the previous version. Small changes slip through and resurface on site, when they cost more.
The agent compares the two versions, lists every difference with a reference to the page or section and flags those that affect structures, building services or the bill of quantities. The engineer starts from the list, not from the whole document.
The bill of quantities must be realigned with the new regional price list
When the region publishes the updated price list, every item in the bill of quantities of a project still open must be rechecked by hand: code, description, unit of measure, price. It's a long job nobody wants to do, and it keeps getting postponed.
The agent matches the items of the exported bill of quantities to those in the updated price list, highlights missing codes, changed descriptions and different prices, and proposes replacements. The technician accepts or corrects line by line.
Technical reports always restart from an old file
Project background, description of the works, materials, criteria adopted: the descriptive parts are copied from a previous report and adapted. There's always the doubt that a wrong town name or material has been left over from the previous project.
The agent writes a first draft of the descriptive parts from the project data and the templates approved by the firm, and flags every sentence it can't match to that project's documents.
Progress statements are prepared by chasing measurements
Site measurements sit in the measurement book, in loose sheets and in staff notes. For the progress statement (SAL), the works director enters them in the accounts register and compares them by hand with the contract bill of quantities, while the contractor waits for the payment certificate.
The agent collects the measurements recorded since the last progress statement, matches them to the bill of quantities items, highlights work exceeding the planned quantities and prepares the draft SAL for review.